Tendering Limits
Construction Workheads (CW01 and CW02)
| |
A1 |
A2 |
B1 |
B2 |
C1 |
C2 |
C3 |
Tendering Limit ($million)
1 Jul 10 to 30 Jun 11 |
unlimited |
85.0 |
40.0 |
13.0 |
4.0 |
1.3 |
0.65 |
Tendering Limit ($million)
1 Jul 11 to 30 Jun 12 |
unlimited |
85.0 |
40.0 |
13.0 |
4.0 |
1.3 |
0.65 |
Specialist Workheads (CR, ME MW and SY)
| |
L6 |
L5 |
L4 |
L3 |
L2 |
L1 |
Tendering Limit ($million)
1 Jul 10 to 30 Jun 11 |
unlimited |
13.0 |
6.5 |
4.0 |
1.3 |
0.65 |
Tendering Limit ($million)
1 Jul 11 to 30 Jun 12 |
unlimited |
13.0 |
6.5 |
4.0 |
1.3 |
0.65 |
|