Integrated Construction and Prefabrication Hub (ICPH)

Background

To steer the industry towards raising productivity, BCA had worked with various government agencies to formulate a masterplan for the development of multi-storey and higher density Integrated Construction and Prefabrication Hubs (ICPHs) on land with 30-year lease term.

ICPHs refer to multi-storey advanced manufacturing facilities for producing prefabricated construction elements, with a high degree of mechanisation and/or automation. Activities in ICPHs include:-

  1. Prefabrication of individual components e.g. precast columns, beams, staircases
  2. Prefabrication of integrated sub-assemblies e.g. Prefabricated Bathroom Units (PBUs), modular prefabricated Mechanical, Electrical and Plumbing (MEP) systems and/or
  3. Prefabricated Prefinished Volumetric Construction (PPVC)


Information on Past ICPH Tenders

BCA has to-date awarded five land tenders for the development of ICPHs through GeBIZ - the procurement portal for the Government, ministries and departments of Government and statutory boards at www.GeBiz.gov.sg. Information on past tenders are shown in the table:

Date of Tender Launch Date of Tender Award Location Site Area (m2) Maximum Gross Plot Ratio Successful Tenderer Bid Price
16 May 2012 28 February 2013 Kaki Bukit Road 6 (KB 1 and KB 2) 20,385.6 1.600 SEF Construction Pte Ltd $4.30/m2 of land area per month
31 July 2013 16 June 2014 20,051.0 1.600 Straits Construction Singapore Pte Ltd $12,000,000 (lump sum)
30 October 2014 21 September 2015 Airport Road (Defu 1 and Defu 2) 20,411.4 1.600 Soil-Build (Pte) Ltd $22,889,000 (lump sum)
30 January 2015 12 May 2016 20,410.7 1.600 Teambuild Engineering & Construction (Pte) Ltd $16,800,000 (lump sum)
7 July 2017 27 July 2018 Pulau Punggol Barat (PPB 1) 38,421.8 1.700 HL-Sunway JV Pte Ltd $24,300,000 (lump sum)