CONQUAS Application



To Initiate CONQUAS Process

For BCA to proceed with the CONQUAS assessment, the applicant (Developer/Builder) can submit the CONQUAS application via CONQUAS e-Application to BCA, Quality & Certification Department. Click here for Fees/Terms and Conditions.

Upon payment of CONQUAS assessment fees, the applicant can request for a briefing to be conducted at the project site office via our CQM On Line Booking system.

The purpose of this briefing is to provide essential information on the operational expectation and assessment details such as total samples to be collected for the project, logistic requirements for the assessment and booking of assessment schedule etc for the Builder. The Builder is encouraged to gather their project team and subcontractors to attend this briefing.

During Assessment

Details of assessment are provided after each assessment. The Builder can use the information provided to identify areas for improvement.

Release of Score

  1. All submissions are to be submitted no later than 3 months after obtaining Temporary Occupation Permit (TOP) for project
  2. All forms are to be signed and endorsed by project Qualified Person
  3. Send submissions via soft copy to email:bca_conquas_esubmissions@bca.gov.sg




Submit structural forms A to D and bonus points form I for precast upon completion of structural stage (where applicable)
STRUCTURAL
Forms Applicable CONQUAS Editions
Attachments required

FORM A
Structural Cube Steel Declaration

FORM A
(100 Kb, pdf file)

7th, 8th and 9th Nil

FORM B
Structural Works Non Destructive Test (Concrete Cover) Declaration

FORM B
(100 Kb, pdf file)

9th
  1. Copy of test lab updated accreditation certificate & equipment calibration report
  2. Concrete Cover Measurement Test results

FORM C
Structural Works Non Destructive Test (Concrete Uniformity) Declaration

FORM C
(100 Kb, pdf file)

9th
  1. Copy of test lab updated accreditation certificate & equipment calibration report
  2. Concrete Uniformity Measurement Test results

FORM D
Welding Test Summary Declaration

FORM D
(100 Kb, pdf file)

7th, 8th and 9th
  1. Magnetic Particle Inspection/Radiographic Examination/Ultrasonic Examination/ Dye Penetration/Others. Submit NDT, MPI, UT Test reports. (soft or hard copy)


Submit forms E to G and bonus points forms J to N upon completion of architectural works, roof, external walls, external works and M&E stages (where applicable)
ARCHITECTURAL
Forms Applicable CONQUAS Editions
Attachments required

FORM E
Wavier for Internal Wet Area In-Process Inspection Declaration

FORM E
(100 Kb, pdf file)

7th, 8th and 9th
  1. Copy of Letter of Award (LOA) between Main Contractor and waterproofing specialist contractor for the waterproofing works.
  2. Appendix or scope of work specifying wet area and roof application covering all Blks, Plots, Internal Units and Roofs.
  3. Copy of waterproofing specialist SCI Accreditation Certificate covering the period of project waterproofing works

FORM F
Architectural Material & Functional Test Declaration

FORM F
(100 Kb, pdf file)

7th, 8th and 9th Nil




MECHANICAL & ELECTRICAL
Forms Applicable CONQUAS Editions
Attachments required

FORM G M&E Performance Test Declaration

FORM G
(100 Kb, pdf file)

7th, 8th and 9th Nil


DRAFT CERTIFICATE
FORMS Applicable CONQUAS Editions
Attachments required

FORM H Draft CONQUAS Cert-Confirmation

FORM H
(100 Kb, pdf file)

All editions Nil


Submit only applicable bonus points for project
BONUS POINTS
FORMS Applicable CONQUAS Editions
Attachments required

BONUS POINTS FORM I
Use of Precast Elements

FORM I
(100 Kb, pdf file)

8th and 9th
  1. Copy of Letter of Award (LOA) between Main Contractor and Precaster.
  2. Copy of Precaster SCI Accreditation Certificate covering the period of project precast elements supply

BONUS POINTS FORM J
Certified QM/CONQUAS Personnel

FORM J
(100 Kb, pdf file)

8th and 9th
  1. Copy of Letter of Appointment (LOA) between Main Contractor and certified QM/CONQUAS personnel.
  2. Copy of certified QM/CONQUAS personnel Certificate(s). Validity of certificates must cover 75% of project duration

BONUS POINTS FORM K
Use of Prefabricated Bathroom Unit(s)

FORM K
(100 Kb, pdf file)

8th and 9th
  1. Copy of Letter of Award between Main Contractor and prefabricated bathroom units supplier

BONUS POINTS FORM L
Use of Prefabricated Prefinished Volumetric Construction (PPVC)

FORM L
(100 Kb, pdf file)

9th
  1. Copy of Letter of Award between Main Contractor and PPVC supplier.
  2. Copy of suppliers PPVC (MAS) certificate (Validity of the MAS certificate must cover the entire period that the PPVC is manufactured for the project.

BONUS POINTS FORM M
Use of Mass Engineered Timber (MET)

FORM M
(100 Kb, pdf file)

9th
  1. Copy of Letter of Award between Main Contractor and MET supplier

BONUS POINTS FORM N
Use of Productive Material(S)

FORM N
(100 Kb, pdf file)

9th
  1. Copy of Letter of Award between Main Contractor and Productive Material Supplier.
  2. Copy of Build ability Score for productive materials only

Release of Provisional and Finalised CONQUAS score
  1. All CONQUAS assessments and samples are to be completed (where applicable) before obtaining TOP for project.
  2. Provisional CONQUAS score will be issued to project after verification of the completeness of submission
  3. We will release the finalised CONQUAS score 9 months after the certified completion date of the project



Submit acceptance form after the release of projects Finalised CONQUAS score
ACCEPTANCE FORM
FORMS Applicable CONQUAS Editions

DECLARATION OF ACCEPTANCE OF CONQUAS SCORE
Structural Cube Steel Declaration

ACCEPTANCE
(100 Kb, pdf file)

Applicable to all editions




For enquiry and submission issues, please contact Mr Simon Yee at email: simon_yee@bca.gov.sg / Mr. Raju at email: Sunthara_VEERACHAMY@bca.gov.sg or CONQUAS hotline at 6730 4400.

   