EVENT INFO

Date: 17 October 2017
Time: 9am to 1pm
Venue: BCA Academy and Site
S$280

Experiential Workshop – Case Study on a Local Steel PPVC Development

Prefabricated Prefinished Volumetric Construction (PPVC) is a technology that fundamentally changes the way we build. In this workshop, the project team of the Wisteria development, with representatives from the Architect, Main Contractor and PPVC specialist will share their project experience and learning points throughout the design, manufacturing and construction stages. In addition, participants will be able to visit the project site to view various PPVC modules and the hoisting process (subject to weather conditions).

CPD POINTS

BOA-SIA: Pending
PEB: Pending
IES & ACES:: Pending

PROGRAMME OUTLINE
TIME PROGRAMME
8.30am Registration
9.10am Design Challenges of Using Steel PPVC in Residential Development
Mr Lim Keng Yong, Deputy Director, Architecture, Surbana Jurong Consultants Pte Ltd
9.30am Leveraging Technology in Construction
Mr Andy Hua, Senior Project Manager, Singapore Engineering & Construction Pte Ltd and Dr Jeremy Wu, Executive Director, Singapore Engineering & Construction Pte Ltd
10.00am Implementation and Challenges of Adopting Steel PPVC
Mr Kor Yew Chai, Executive Director, Singa Development
– Moderna Homes
10.30am Q & A / Departure Briefing
10.45am Tea Break
11.15am Departure to Wisteria for Site Visit
11.45am Site Visit:
  • Launching of a PPVC Module
  • PPVC Modules
1.00pm End of Workshop
TARGET AUDIENCE

Developers, Architects, Engineers, Contractors, Resident Engineers, Resident Technical Officers & Academia.

FEE (Inclusive of GST)
S$280.00
Morning refreshment and two-way transportation from BCA Academy to the project site will be provided. PPE not required. Limited slots available

Register Now
Top