Government officials will NEVER ask you to transfer money or disclose bank log-in details over a phone call.

Call the 24/7 ScamShield Helpline at 1799 or visit www.scamshield.gov.sg to check if something is a scam.

×
!
Last Updated: 1 May 2026
Performance By MCL Land Ltd
S/N
Project
CONQUAS Band
Project Developer
Developer
Builder
Architect
Year
1 Copen Grand
(1)
Taurus Properties SG Pte. Ltd. City Developments Ltd (CDL) / MCL Land Ltd Woh Hup (Pte) Ltd 2026
2 Parc Esta Condominium
(1)
MCL Land (Everbright) Pte Ltd MCL Land Ltd China Construction (South Pacific) Development Co Pte Ltd P&T Consultants Pte Ltd 2024
3 Leedon Green Condominium
(2)
Asia Radiant Pte Ltd MCL Land Ltd / Yanlord Land Ltd TPS Construction Pte Ltd DCA Architects Pte Ltd 2024
4 Margaret Ville
(1)
MCL Land (Regency) Pte Ltd MCL Land Ltd TPS Construction Pte Ltd Architects 61 Pte Ltd 2022
5 Piccadilly Grand & Piccadilly Galleria
Under Assessment
Maximus Residential SG Pte Ltd & Maximus Commercial SG Pte Ltd City Developments Ltd (CDL) / MCL Land Ltd China Construction (South Pacific) Development Co Pte Ltd ADDP Architects LLP
6 Nava Grove
Under Assessment
Golden Ray Edge 3 Pte Ltd MCL Land Ltd / Sinarmas Land China Communications Construction Co Ltd (Singapore Branch) P&T Consultants Pte Ltd
7 Tembusu Grand
Under Assessment
City Developments Ltd (CDL) City Developments Ltd (CDL) / MCL Land Ltd United Tec Construction Pte Ltd ADDP Architects LLP
8 ELTA
Under Assessment
HC Land (Clementi) Pte. Ltd. MCL Land Ltd / CSC Land Group China Construction Realty Co. Pte Ltd P&T Consultants Pte Ltd


Explanatory notes

QHP Listing – Only firms and their CONQUAS projects (private residential) completed in the last 6 years are banded

CONQUAS – CONQUAS assesses the quality of building projects at the point of inspection. The assessment is based on a sampling of units in a project, covering both internal and external finishes, and functional tests (e.g. window and toilets/bathrooms watertightness tests). Latent defects that may appear after handover or during the defects liability period cannot be accounted for at the point of CONQUAS assessment, as such defects cannot be foreseen. However, BCA reserves the right to moderate the CONQUAS® score where valid feedback on major defects is received from homeowners after the project has obtained Temporary Occupation Permit (TOP).

CONQUAS Band – It reflects a project's CONQUAS performance (which is determined by BCA's CONQUAS assessment and consideration of validated feedback from homeowners), or a firm’s CONQUAS track records based on its CONQUAS project performance/s over the past 6 years. The performance is represented on a banding scale, with Band 1 being the best (very low incidence of major defects) and Band 6 being unsatisfactory (very high incidence of major defects). Based on past records, projects with Band 1 had very low incidence of major defects. "Under Assessment" is defined as projects that have taken up CONQUAS assessments and the assessment are ongoing. "Not banded" is defined as projects that do not take up CONQUAS assessments by BCA or had withdrawn from CONQUAS i.e. quality performance unknown.

Use of Information and Materials : BCA has made every attempt to ensure the accuracy and reliability of the information provided on this website. However, the information provided is provided “as is” without warranty of any kind. BCA does not accept any responsibility or liability for the accuracy, content, completeness, legality, or reliability of the information contained on this website.

No warranties, promises and/or representations of any kind, expressed, implied, are given as to the nature, standard, accuracy or otherwise of the information provided in this website nor to the suitability or otherwise of the information to your particular circumstances.

To the maximum extent permissible by applicable law, BCA shall not be liable for any and all damages of any kind arising from the use of information provided on this website, including but not limited to, damages which are special, incidental, direct, indirect, consequential or punitive in nature, including lost profit, lost revenue or loss of data, whether foreseeable or otherwise, even if informed in advance of the possibility of such damages, and whether arising in contract, tort (including negligence) or otherwise.

The contents of this website are subject to change and may be modified, deleted or replaced from time to time at the sole discretion of BCA.

Please contact BCA_CONQUAS_Enquiry@bca.gov.sg for clarifications, if required.